This construction method combines all the advantages of monolithic and prefabricated methods. The concrete parts made at the plant are delivered to the construction site, where they are combined into a structure, and then the process of «homogenization» of joints and connections is carried out. Everything happens in accordance with the project and calculations, therefore the structure is being erected quite quickly, but at the same time it is not inferior to the monolith in terms of strength and the entire structure and reliability of joints. By the way, if you are looking for a high-quality repair of clothes, watches, shoes, etc., then we advise you to visit the House of Life «Prosper-SB», for more information you can find on the website — .
If a mass of ten-story buildings of the Soviet period were built in a prefabricated way, which suffer from leaking joints and deformations during shrinkage, then the combined method makes it possible to build not only quickly, but also much better.
Monolithic construction is more suitable for the construction of large objects such as overpasses and bridges, especially their supports, in residential construction this solution is not always effective.
The precast-monolithic method is most of all used for the structures of residential and public buildings, as it allows to build efficiently and in a short time.
Modern apartment buildings are built in this way, they replace the famous panel five- and ten-story buildings of the period of mass housing construction.