The most effective and common method of solving the problem of poor-quality concrete floor is a screed.
If the uneven base in the winter season is very cold, you can insulate it on your own..
Insulation of a concrete floor
Styrofoam is suitable for this purpose. Sheets of expanded polystyrene are laid in a dense layer on the base. To fix the insulation elements, special fasteners (rondels) are used. Holes are drilled with a perforator through the insulation into the concrete and the expanded polystyrene is fixed with a rondel using a hammer.
Installation of beacons
Lighthouses should be placed along the entire length of the room in one meter increments. First of all, knead in a container, a little, any gypsum mixture. Plaster cakes are laid in the place of the direction of the lighthouses. Then the beacon profile is pressed into them. While the gypsum solution has not frozen, the beacons are adjusted using a level in height. Then they pause in work until the gypsum solution completely solidifies..
Filling the screed
The screed solution is kneaded in the container, using a construction mixer for this. Part of the solution is placed between the beacons. Then, using the rule, evenly distribute the solution between the beacons. The rule is carried out along the lighthouses, as a result of this, the solution lays down in an even layer on the concrete base. In this way, the entire area of the room is treated..
The White Cat company produces custom-made photo wallpaper printing according to individual parameters. The cost of making wallpaper is the most favorable here. Wallpaper printing is carried out on new equipment using high-quality materials. All information is published on the company’s website.